Specifications include, but are not limited to: GENERAL REQUIREMENTS/OVERHEAD AND PROFIT INCLUDING SUPERVISION; MOBILIZATION, INCLUDING BONDS, INSURANCES, PERMITS; . DIVISION 02 –EXISTING CONDITIONS . DIVISION 03- CONCRETE . DIVISOIN 04 - MASONRY . DIVISOIN 06 - MILLWORK . DIVISOIN 07 – THERMAL AND MOISTURE PROTECTION . DIVISION 08 - OPENINGS . DIVISOIN 09 - FINISHES . DIVISION 11 - LOAD DOCK LEVELERS . DIVISOIN 21 – FIRE SUPPRESION . DIVISOIN 22 - PLUMBING . DIVISION 23 – HEATING VENTILATING AND AIR CONDITONING (INCLUDING BUILDING CONTROLS INTEGRAITON. HONEYWELL) . DIVISOIN 26 – ELECTRICAL . DIVISION 27 – COMMUNICATIONS . DIVISION 28 – ELECTRONIC SAFETY AND SECURITY (HONEYWELL) . ICRA COMPLINACE MEASURES . PERMITS AND FEES