Specifications include, but are not limited to: the removal and disposal of existing fin tube expansion joint and provide new expansion joint and piping as required to connect to existing low-pressure steam fin tubes at OPS Lewis & Clark Middle School, as specified in these Bid Documents. The Contractor will furnish all labor, materials, equipment, and services necessary to provide a completed project as outlined in these Bid Documents, including the removal of debris and repair of any damage occurring during performance of the work under the Contract Documents. In general, all materials and equipment to be furnished by Contractor must be of good quality, new and unused, and shall be constructed and installed as required in the Contract Documents and of the types of equipment and materials as specified. It is the Contractor’s responsibility to protect existing construction. In addition, daily removal of debris and repair of any damage due to work under this Contract is considered within the scope of work and is the responsibility of the Contractor. All work for the Project shall be performed by Contractor. Work shall not be subcontracted. All work must be done in accordance with best trade practices using qualified workmen. All work shall be performed in a manner that does not void any manufacturer’s warranty. All engineering work and plan preparations for shop drawings and other Contractor submittals shall be the responsibility of the Contractor, who shall utilize qualified and licensed engineers for such work.