Specifications include, but are not limited to: 020 Site Development Building demolition to include the following: -Remove and dispose of flooring. -Remove and dispose of ceiling as required for work. -Remove and dispose of cabinetry. -Remove and dispose of toilets, sinks, shower unit. -Demo interior walls as required for new layout. -Rework plumbing as required for new layout. -Saw cut and remove concrete as required for new layout. -Demo as required for the new floor drain. 030 Concrete -Pour back concrete as required for modified plumbing work. 050 Metals -Provide and install metal stud walls as required for the new layout. -Build chase for fume hood exhaust to north exterior wall. 060 Woodwork/Carpentry -Provide and install new cabinetry as per plans. Cabinets to be plastic laminate with color selection by owner. -Provide and install stainless steel countertop throughout dry lab area (south room). 070 Thermal Moisture Protection -Insulate new walls with fiberglass batt insulation. 080 Doors, Windows & Glass -Provide and install (1) each new 6/0x6/8 hollow metal door and frame. Hardware to include lever lockset, closer, threshold, seals, sweep, and hinges. Inactive door to have flat bar astragal with head/foot bolt. Narrow vision lite kit to be installed on the active side. -Provide and install (1) each new 3/0x3/0 hollow metal door and frame. Hardware to include lever lockset, transition, hinges. 090 Finishes -North room walls to be repaired and prepped for FRP board. -Provide and install FRP board on the north room walls. -Repair walls in the lab, prime, and paint with two coats of an interior latex paint. -Provide and install an epoxy floor system with a 4” cove base (both rooms). -Doors and door frames in work areas will be painted with two coats of a semi-gloss paint. -Construct soffit for ductwork. -Repair ceiling as required, texture, and paint. 110 Equipment -Fume hood by owner.