Specifications include, but are not limited to: A. Selective Demolition is the removal of existing selected infrastructure from its current location at the Project Site in a manner that does not destroy the items to be removed, nor alter the ability of these items to be reused elsewhere for similar purpose. Selective demolition is to be executed so as not to damage adjacent infrastructure. B. Salvage is the transport and storage of items scheduled for demolition. 1. Salvaged items are to be removed using means and methods which do not alter the useful function of the item after removal and storage. 2. Salvaged items are to be transported by the CONTRACTOR to a storage location designated by the Owner and/or otherwise indicated in these Contract Documents. 3. Salvaged items are to be protected by the CONTRACTOR against damage or loss a. During removal of the salvaged items from the Project Site b. During transport to the OWNER’s storage location. C. Disposal is the transport of items from the project site not scheduled for salvage, and delivery to a waste disposal site permitted to receive the items. Alternately, at the CONTRACTOR’s choosing, items scheduled for disposal may be salvaged by the CONTRACTOR for his own use. The CONTRACTOR’s election to salvage items scheduled for disposal shall not require interim storage of those items at the project site nor placement at a location where authority for that purpose has not been granted to the CONTRACTOR.