Specifications include, but are not limited to: Roadway Construction: • 33rd St. beginning 550 feet south of the intersection with Villa St. northwards to 34th St., 34th St. from the intersection of 33rd St. south to the Villa St. intersection: Roadway infrastructure and drainage improvements to include removal of existing asphalt surface and base material. Re-compaction of subgrade and base material and installation of new asphalt surface. Reconstruction of driveways, sidewalks, curb ramps, fillets, and curb and gutters will be completed on an as needed basis. New storm drain installation to include new storm drainpipe, retrofitting drop inlets tops and installation of three (3) curb drop inlets. (Roadway Reconstruction: Approximately 3,470 feet). Utility Construction: • New water lines and services will be installed in all the roads listed above. All existing sewer crossings beneath the roads to be repaved will be reconstructed by trenchless methods. A 10” sewer line in the back yards of homes fronting 35th Street will be rehabilitated using the trenchless method of spiral PVC lining. The existing water lines will be capped and abandoned. All existing surface features will be removed and disposed.