Specifications include, but are not limited to: Scope of Work will begin at existing elevation & remove all unwanted material and haul off site. City of Natchez will provide area for material dumping. For Field #1, unwanted material/dirt is to be placed to the left of the outfield fencing. For Field #2, unwanted material/dirt is to be placed to the left of the outfield fencing near the outfield Excavate excess dirt and debris; see above for place(s) in disposal area provided by the City of Natchez Laser grade infields for shedding of water Install 2”x 4”x 16’ treated nailer boards around perimeter of each field which will be permanently attached around the entire system to receive artificial turf Install sub-base concrete or 4” inches of Limestone to grade. Level and compact stone or pour concrete to insure level grade with no standing water and/or birdbaths. If using Limestone, specify Install shock pad & drainage blanket Supply & install sports turf material and professional turf adhesives