Specifications include, but are not limited to: 0002 204.0110 Removing Asphaltic Surface SY 8,766.000 _________._____ _________._____ 0004 211.0101 Prepare Foundation for Asphaltic Paving (project) 01. 6999-18-78 EACH 1.000 _________._____ _________._____ 0006 213.0100 Finishing Roadway (project) 01. 6999- 18-78 EACH 1.000 _________._____ _________._____ 0008 305.0120 Base Aggregate Dense 1 1/4-Inch TON 25.000 _________._____ _________._____ 0010 455.0605 Tack Coat GAL 435.000 _________._____ _________._____ 1.00000 0012 460.2000 Incentive Density HMA Pavement DOL 1,090.000 1,090.00 0014 460.5224 HMA Pavement 4 LT 58-28 S TON 975.000 _________._____ _________._____ 0016 460.5225 HMA Pavement 5 LT 58-28 S TON 730.000 _________._____ _________._____ 0018 465.0110 Asphaltic Surface Patching TON 7.000 _________._____ _________._____ 0020 611.8110 Adjusting Manhole Covers EACH 8.000 _________._____ _________._____ 0022 611.8120.S Cover Plates Temporary EACH 14.000 _________._____ _________._____ 0024 618.0100 Maintenance And Repair of Haul Roads (project) 01. 6999-18-78 EACH 1.000 _________._____ _________._____ 0026 619.1000 Mobilization EACH 1.000 _________._____ _________._____ 0028 628.1905 Mobilizations Erosion Control EACH 2.000 _________._____ _________._____ 0030 628.1910 Mobilizations Emergency Erosion Control EACH 1.000 _________._____ _________._____ 0032 628.7015 Inlet Protection Type C EACH 20.000