Specifications include, but are not limited to: 1. Mask wall - plastic, paper, tape (per LF) Includes: 2 mil plastic (9' wide roll), masldng paper, masking tape, and labor. 2. Floor protection - cardboard and tape Includes: Cardboard, masldng tape, and labor. 3. Blown-in insulation - 6" depth - Rl3 Includes: Insulation, blower machine equipment charge, and installation labor. 4. 5/8" drywall - hung, taped, floated, ready for paint Includes: Drywall, metal corner bead, joint/texture compound (mud), drywall nails, joint tape, grabber screws, and installation labor. 5. Acoustic ceiling (popcorn) texture Includes: Popcorn style acoustic ceiling texture, texture machine, and installation labor. 6. Detach & Reset Light fixture Includes: Ceiling fan with light and installation labor. 7. Final cleaning - construction - Commercial Allowance to replace drywall, insulation, popcorn texture on ceiling 8. R&R Vinyl plank flooring - High grade