All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: Construction of a 12,000 gallon Jet-A fuel tank, fuel truck rack loading/unloading skid, concrete containment pad around the two existing and the new fuel storage tanks, construction of a truck fuel loading and unloading containment pad, construction of a secondary containment basin with discharge pump, construction of a stormwater retention basin, construction of UG containment piping, modifications to the two fuel tank loading/unloading hard piping, connections and spill boxes, construction of asphalt paving, construction of security fence and gates including motor operated gates, provision of temporary truck loading and unloading containment basin, demolition of existing fence, asphalt pavement – including pavement under the two existing fuel tanks, and other work to complete the project