Specifications include, but are not limited to: The Division of Parks and Recreation is proposing to replace the existing underground water system, install new utility poles for overhead service and bury the existing above ground electric utilities at Greenfield State Park. It is the intent to co-locate underground water and electric service illustrated in Appendix A. Some of the proposed underground utility corridor has been disturbed previously by the installation of the underground water system, however, there are new routes proposed that have no record of utility disturbance. The expected area of underground disturbance is 20’ to either side of the utility route identified in Appendix A which is approximately 10,317 linear feet. The consultant shall: 1. Review existing documents at the Division of Historical Resources. 2. Conduct site visit to assess archaeological sensitivity. 3. Provide the Division of Parks and Recreation a Phase 1A report prepared in accordance with the guidance from the NH Division of Historical Resources1 . 4. Provide two print copies with original photographs and one electronic copy of the final report.