Specifications include, but are not limited to: Construction of Storage Shed at Monroe Middle School to the East side of the building. The work under this specification shall include all labor, materials, equipment, and services necessary to provide a completed project as outlined in the Contract Documents, including Construction of a Storage Shed at Monroe Middle School. In addition, daily removal of debris and repair of any damage due to work under this Contract is considered within the scope of work and is the responsibility of the Contractor. Contractor shall be able to perform all of the services required to complete the Work that is required by the Contract Documents. Contractor is responsible to protect existing construction. In general, all materials and equipment to be furnished by Contractor must be of good quality, new and unused, and shall be constructed and installed as required in the Contract Documents and of the types of equipment and materials as specified. All engineering work and plan preparations for shop drawings and other Contractor submittals shall be the responsibility of the Contractor, who shall utilize qualified and licensed engineers for such work.