Specifications include, but are not limited to: Replacement of four (4) commercial washer extractors and four (4) commercial dryer-tumblers with new. A. At Northern Correctional Facility and Jail, there is one (1) 80-pound and three (3) 85-pound commercial washers-extractors and four (4) 120-pound commercial dryer-tumblers that must be replaced with new. The commercial washer-extractors must be replaced with new 105-pound commercial washers-extractors. The commercial dryer-tumblers must be replaced with new 120-pound commercial dryer-tumblers. Additional information on the project is listed below. B. Existing commercial washer-extractor and commercial dryer tumblers information: 1. There are four (4) commercial washer extractors that are manufactured by Alliance Laundry Systems, Unimac: a. Unimac, Model #: one (1) – UW80TVQU10001 and three (3) – UW85S3AU1 b. Each machine operates off of a 208-volt, 3-phase, 30-amp breaker, at 60 hertz. c. The existing are rated at one (1) at 80-pound and three (3) at 85- pounds. d. Each machine is setting on a concrete pad that is attached to the concrete. The new commercial washers must be fastened to the concrete floor. The contractor must remove the existing mounting screws and install new in the concrete pads for the new equipment. e. The main hot and cold-water pipes that feeds water is an estimated one and half (1.5”) inches. At each washer, there is a rubber hose that is connected to each machine and is an estimated three quarter (3/4”) inch. Vendor must install a new rubber hose to the new commercial washer extractors. Any modifications that must be done to install the new commercial washer extractors, will be the contractor’s responsibility and will be required to do. f. The machines are gravity feed with a drain that is an estimated 3” that goes to through the concrete pad to a floor trough. g. ECO Labs provides the chemical provider for the machines. The vendor must coordinate with ECO Labs to have them remove the existing chemical equipment and connections and then reinstalled. g. The electric for each machine is feed from an electric panel to a 60- amp, non-fused disconnect. Contractor must use the existing disconnect switches and electrical wiring.