Specifications include, but are not limited to: Described below is a general scope of work for the installation of power, water and sewer utilities. The scope may be modified in the best interest of the project. You must be able to provide certificate of insurance naming the town as an additional insured prior to start of work. Owner will provide dumpster and porta potty. Task-1 1. Sewer : furnish all labor, materials and equipment in accordance to plans and specifications. Task-2 1. Water: furnish all labor, materials and equipment in accordance to plans and specifications. Task-3 1. Power line Extension: Dig a trench and install conduit from the Depot to the utility pole on North St. Contractor will furnish all labor, materials and equipment in accordance with the specifications as identified by Green Mountain Power. Task -4 1. Masonry : Place 8” block around the exterior of the foundation and brick around the concrete block. Repair the two existing chimneys.