Specifications include, but are not limited to: 1. Coordinate with the Entity and DOTD District personnel to schedule and attend the pre-construction meeting. Consultant will be required to conduct the meeting. 2. Maintain all construction field records; make daily entries in the project diary (DWR) to indicate Consultant’s personnel present on the job site, Contractor’s personnel and equipment being utilized on the project, the work being accepted, the acceptability of traffic control, and the charging of contract time. 3. Coordinate with the Entity’s Engineer/Representative for all relocations/adjustments of utility facilities for the construction of work site. 4. Provide all necessary personnel and equipment to perform the required field-testing for quality assurance in accordance with the latest DOTD Sampling and Testing Manual and pertinent Quality Assurance Manual. 5. Submit all sampled materials to be tested by DOTD District 61 Testing Laboratory, in accordance with the stipulated Sampling Manual and pertinent Quality Assurance Manual. 6. Inspect Contractor’s construction operations (daily) to ensure that all work is performed in accordance with the specified plans and specifications. 7. Keep clear and concise records of the contractual operations, prepare monthly pay estimates, and make monthly progress reports in conformance with DOTD requirements. Inspection of construction will not include shop and mill inspections and their approval. 8. Prepare final estimate packages, including Form 2059 – “Summary of Test Results” in conformance with DOTD Construction Contract Administration Manual. 9. Consultant will be responsible for submittal approvals required of the project engineer as stated in the Standard Specifications including form drawings.