Specifications include, but are not limited to: Removal and disposal of existing boilers, pumps, capping the existence lines going to geothermal loop in both of these facilities. Also, adding heat exchangers, cooling towers, holding water tank and one boiler to each facility The Contractor will furnish all labor, materials, equipment, and services necessary to provide a completed project as outlined in the Contract Documents. In general, all materials and equipment to be furnished by Contractor must be of good quality, new and unused, and shall be constructed and installed as required in the Contract Documents and of the types of equipment and materials as specified. It is the Contractor’s responsibility to protect existing construction. In addition, daily removal of debris and repair of any damage due to work under this Contract is considered within the scope of work and is the responsibility of the Contractor. All work for the Project shall be performed by Contractor. Work shall not be subcontracted