Specifications include, but are not limited to: Demolition Contractor will be responsible for all required demolition, and the reinstallation of all electrical infrastructure to allow the building to be provided with emergency power. The contractor will be responsible for installing the appropriately sized concrete generator pad per manufacturers recommendations. The pad is to be raised to a height to ensure floodwater does not impact the operation of the new generator. The contractor will be responsible for all modifications to the existing building, and future generator system. This is to include new infrastructure to feed electrical services to the new chiller (not currently yet on-site) currently being installed on emergency power. New Retrofit Accepted Products This RFP requests the delivery, installation, and all subsequent work for one new generator at the Administrative Center. It is estimated the generator sizing should be approximately a 450kw diesel generator with SE rated ATS, 120/208 3ph 4w. All labor, permits, engineering fees, crane rentals, bonding, transfer switches, conduit, wiring, equipment, panels, and other such equipment is to be provided within the scope of this proposal.