Specifications include, but are not limited to: A. Each year during the spring season (March through May) and again during the fall season (September through November) Contractor shall inspect the roofs for deficiencies at the CHP Golden Gate Air Operations, 3500 Airport Road Napa, CA 94558. The inspection will include but is not limited to all gutters and downspouts to ensure they are clean and free flowing. All deficiencies will be documented, photographed, and submitted to the CHP Facilities Coordinator or designee. i. Remove all debris from roof surface. ii. Photograph and document any deficiencies on the Roof Inspection Checklist, Exhibit A-2. Immediately notify the CHP Facilities Coordinator of all deficiencies. iii. Inspect interior of building for signs of water penetration, frost build-up, and structural distress. The CHP on-site contact will walk the facility with the Contractor. iv. Inspect exterior of building for continuity of roof covering, deterioration of fascia’s, gutters, and soffits, and performance of flashings.