Specifications include, but are not limited to: A. Modernize two (2) traction passenger elevators: Cars 1-2 B. Provide all labor, engineering, tools, transportation, services, supervision, materials, and equipment necessary for and incidental to satisfactory completion of required work as indicated in Contract Documents. C. Contractor shall obtain and pay for or cause its Subcontractors to obtain and pay for all permits required to complete required work. D. Applicable conditions of General, Special, and Supplemental Conditions, Division 1, and all sections listed in Contract Documents “Table of Contents.” E. Preventive maintenance as described in Item 1.08, below and Section 14325 herein. F. Cartage and Hoisting: All required staging, hoisting, and movement to, on, and from the site including new equipment, reused equipment, or dismantling and removal of existing equipment. G. Unless specifically identified as “Reuse,” “Retain,” or “Refurbish,” provide new equipment. H. Protective barrier(s) between car(s) in normal operation and adjacent car(s) in the modernization process. Full depth and height of hoistway. I. Hoistway, pit, and machine room barricades as required. 1.02 RELATED WORK PROVIDED BY ELEVATOR CONTRACTOR/OTHER TRADES A. General Construction Work: 1. Wall blockouts and fire rated closure for control and signal fixture boxes which penetrate walls. 2. Provide all cutting and patching in machine room, hoistways and pits. 3. Patch and/or caulk all penetrations and voids in hoistways and around frames to ensure proper fire rating. 4. Provide all rigging, cutting, patching, etc., for removal of existing elevator equipment and installation of new elevator equipment in machine room. 5. Protect open hoistways and entrances during construction per OSHA Regulations. 6. Protect car enclosure, hoistway entrance assemblies, and special metal finishes from damage. 7. Remove any louvers, grating, blowers, heaters, including any associated conduit, piping, etc., not retained and utilized as a component of the HVAC system. Fire-safe any voids in machine room walls or floors created from removal of equipment to maintain fire rating of room. 8. Seal fireproofing to prevent flaking. 9. Furnish and install label signage on exterior of door indicating “Elevator Equipment Room” in minimum 1/2" high lettering. 10. Paint machine room walls and ceiling white at completion of project. 11. Provide powered louvers for hoistway venting as required by Code. 12. Ensure code-compliant operation of pit sump systems. 13. Paint walls and ceiling white at completion of project. 14. Car 2: Ensure laminated glass meets the requirements of ANSI Z97.1. Interior ledges created by glass mullions not to exceed 4". Correct as necessary.