Specifications include, but are not limited to: All trail upgrades and repair work will take place on the specified segment of the Fieldstone West Trail. 2. Work projects to include: trail brushing, stone cribbing installation, trail surfacing installation, geogrid installation, and culvert installation. 3. Location of each work project is outlined in the attached Trail Assessment Plan. The trail log indicates the location of each work site. To arrive at work stations, a Rollatape should be set at 000’ at the segment of the Fieldstone West Trail identified and described in the Trail Assessment Plan and measured out clockwise, ending at 1964’. All work begins at measurement 1964’ and ends at measurement 000’. Work priority locations are noted on the trail log and attached map. 4. Import of construction materials will have two options: a) across the bridge access which has a stated max. weight limit of 10,000 lbs. and b) via the park’s emergency vehicle entrance, west of the bridge, which has no weight or vehicle restriction. The area for staging construction materials at the park can be reviewed during the October site visit. 5. The only segments of the Fieldstone West Trail that will accommodate large construction vehicles (i.e. dump trucks) are from 000’ to approximately 1100’. This can be reviewed during the October site visit.