Specifications include, but are not limited to: A. Clear and remove all overgrown vegetation that is within 2 feet of fence line. B. Remove and replace approximately 625’ chain link fence with 6-foot-tall chain link fence, including two (2) swing/slide gates to match fence. C. Install new line posts every 6 feet on center - 2 7/8” Schedule 40 set in 12x48 footing. D. Install privacy slats in new chain link fence for privacy. E. Top and mid rail - 1 5/8” Schedule 40. F. Bottom tension wire 9 gauge smooth. G. Install three strands of barbed wire and finish with razor wire. H. Contractor is required to secure back lot at the end of each day of work to prevent unauthorized access to the secure back lot during afterhours. I. Maintain a safe working environment to prevent injuries to CHP personnel or damage to CHP property. J. The Contractor, at no expense to the State of California, will repair any damage caused by the Contractor or any of his/her workers. K. The Contractor must field verify any and all measurements encompassed in this project and is solely responsible for their accuracy. L. The Contractor will keep the work site clean and haul away any work site debris. Removed material must be recycled where possible. M. Warranty all parts and workmanship for a period of one (1) year. Contractor to supply the manufacturer’s warranties and manuals for any parts used in this project.