Specifications include, but are not limited to: The work to be done consists of furnishing all materials, equipment, and labor necessary to construct roadside enhancements including sidewalk enhancement and drainage improvements along ±285 linear feet of Underwood Ave (S-27), ±540 linear feet of Dearborn St (S-20), and ±220 linear feet of Catawba Ave (S-249). 1 1 LS Mobilization $_______ $________ 2 1 LS Demolition $_______ $________ 3 1 LS Traffic Control $_______ $________ 4 212 SY Concrete Sidewalk with Brick Edge and Integral Curb $_______ $________ 5 57 SY Concrete Sidewalk with Brick Edge $_______ $________ 6 252 SY Concrete Sidewalk with Integral Curb $_______ $________ 7 37 SY 6” Thick Concrete Driveway $_______ $________ 8 76 SY Asphalt Full Depth Patching (8” thick) $_______ $________ 9 36 SF Detectable Warning Surface $_______ $________ 10 75 SY Pavement Markings – Crosswalk Hatching $_______ $________ 11 123 LF 24” Curb and Gutter $_______ $________ 12 56 LF 18” RCP $_______ $________ 13 3 EA Type 16 Catch Basin $_______ $________ 14 1 EA Type 17 Catch Basin Top $_______ $________ 15 1 EA Type 1 Catch Basin Top $_______ $________ 16 2 EA 24” x 24” Drop Inlet $_______ $________ 17 9 EA Inlet Protection $_______ $________ 18 1 EA ADA Compliant Junction Box Cover/Inlet $_______ $________ 19 2 EA Remove/Replace or Adjust Yard Inlet Grate $_______ $________ 20 26 LF 4’ Slope Flume (6” Curb Style with Cutoffs) $_______ $________ 21 10 TON Rip Rap (Class B) $_______ $________ 22 25 SY Geotextile for Erosion Control under Rip Rap (Class 2) Type C $_______ $________ 23 175 LF Ditch Grading/Cleaning $_______ $________