Specifications include, but are not limited to: The purpose of this project is to replace sidewalks, curbs, and gutters along the southside of Columbia Street, between 4th Street and 6th Street; to replace sidewalks, curbs, and gutters along both sides of 5th Street between South Street and Columbia Street; to improve accessibility along pedestrian corridors; to install new decorative brick pavers; to replace existing and install new trees; to install new accessible curb ramps; to adjust existing and install new storm sewer structures and pipe; to replace traffic signal infrastructure at the Columbia Street and 5th Street intersection; to install new street lighting, electric services and circuits; to replace or resurface existing pavements; and to perform any other miscellaneous work pertaining to the project.