Specifications include, but are not limited to: The Metropolitan Entertainment & Convention Authority (“MECA”) is requesting proposals from qualified organizations interested in performing all services to inspect and clean twelve sections of 15kV Switchgear at CHI Health Center Omaha (“CHIHCO”). MECA is responsible for managing the operations of this Facility; • Inspect and clean accessible switchgear bus, bus supports, and primary disconnects • Remove bus covers and barriers, and clean bus insulation, supports, boots and connections o Note: Any taped or sealed bus connections should not be cut open, exposed, or torqued • Inspect and clean bus barriers, supports, primary disconnect bottles and primary disconnects o Verify bus and runback bus bolt torque and conductance (micro-ohm or ductor) • High potential test switchgear bus • High potential test circuit breaker runbacks (and cables) as desired and where isolation is feasible • Clean, inspect and lubricate circuit breaker primary disconnects, conductors, supports & barriers • Clean, inspect and lubricate circuit breaker secondary disconnects, conductors and connections • Clean, inspect and lubricate circuit breaker trip, close, spring charge and racking mechanisms • Clean, inspect and lubricate circuit breaker auxiliary, MOC and TOC switches • Inspect and test the control power supply (close, trip and spring charge) circuits. • Test circuit breaker contact, and primary disconnect conductance (ductor/microohm) • Test circuit breaker insulation resistance (high potential) tests • Control components – check fuses, status lights and wiring termination screw tightness • Inspect protective relays for power, general operation, errors, targets, events & alarms • Inspect and test tripping control power capacitor trip devices • Inspect control power source transformers and switching devices • Perform trip/close operations check on circuit breakers and control circuits • Verify that control switches are in their normal (ready) positions • Verify that indicating lights are operational and that no alarms are present • Verify that electrical metering is operational and functioning correctly • Inspect housings for water leaks, rust, and corrosion • Testing of the 12 Cutler-Hammer Digitrip 3000 Circuit Protection Relays • Provide a full testing report once maintenance and testing has been completed • Provide system operator training of up to three (3) hours