Specifications include, but are not limited to: This project consists of providing new upgraded Cell Doors and Shower Doors/Hardware to 4 units at the Adobe Mountain Juvenile Corrections. Construction documents prepared by Marlene Imirzian Architects & Associates and ADOA Division 1. Logistics Installation i. ADJC will empty one building out at a time ii. When a building is complete there will be testing that each door has been installed, low voltage is connected, and control panels are synched with each door. All punchlist items must be completed prior to requesting the start of a new building door installation iii. ADJC will relocate students on the weekend Staging - Contractor provide a lockable Connex Box Waste - Contractor to provide metal and trash dumpsters