Specifications include, but are not limited to: Construction Materials Testing for a new 3 story steel frame construction (~70,000 sf) including geotechnical, concrete, masonry and steel special inspections. Construction is anticipated to begin in October 2022 and continue through September 2024. Firms desiring to be considered for providing professional services for this project should send a statement of interest that outlines qualifications and experience for this project. Statements of Interest should at a minimum include the following: 1. Specialized expertise, capabilities, experience in commissioning similar facilities, and technical competence as demonstrated by the team's capabilities, proposed approach and methodology to meet the project requirements. (30%) 2. Resources available to perform the work, including any specialized services, within the specified time limits for the project. Include resumes of all personnel, including sub-consultants who will be assigned to this project for the entire duration. (30%)