Specifications include, but are not limited to: 1. Obtain necessary permitting. 2. Set up and erect safety equipment as required by OSHA. 3. Furnish & install the following: Field 1: *Furnish and install two new dugout/field gates (@ 4’ and 5’ wide) at the existing height. Adjust support pole(s) as necessary. *Repair or replace the existing maintenance swing gate along/within the existing left field fencing for proper function. Field 2: *Furnish and install a new, 6-foot-high outfield fence at an arcing distance of 200 feet from home plate. Said arc distance is approximately 366 linear feet. Posts and chain link fencing (all) are to be galvanized and the top of the new outfield span is to be covered with the yellow plastic safety tubing/covering, similar to what exists along the left and right field foul line fencing. *Furnish and install two new foul poles. *Furnish and install two new dugout/field gates (@ 36” and @42” wide) at the existing height. *Remove and dispose of the existing, sliding maintenance gate as well as all associated posts/concrete footings. *Furnish and install a new, 12’ maintenance swing gate (double gate) along/within the existing right field fencing. Field 3: *Remove and dispose of the existing, sliding maintenance gate (left field) as well as all associated posts/concrete footings.