All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: Mountain Line and the City of Flagstaff are partnering to design and construct a series of pedestrian and bicycle infrastructure improvements across Flagstaff to support access to transit, with $6.9 million in funding available through grant funds from Federal Transit Administration (FTA) . This project will be referred to as First Mile Last Mile (FMLM) projects throughout. In conjunction with these projects, Mountain Line is seeking Statements of Qualifications from Arizona licensed Design Professionals (DP) to provide Engineering Services on a task order basis to prepare design plans for the infrastructure improvements. It is anticipated FMLM projects will be delivered by Construction Manager at Risk (CMAR). DP shall collaborate with City and CMAR for constructability reviews and integrate CMAR input into design development. The awarded firm may include subconsultants. Technical team disciplines shall include civil, land surveying, traffic engineering, geotechnical, and structural The City will assign a Project Manager to deliver the FMLM projects. The City Project Manager will be the DP’s direct point of contact for the project.