Specifications include, but are not limited to: The Authority is accepting proposals for the painting of arena marquee signage and (3) entrance canopies. 6.1.1 Powerwash all surfaces. Surface prep steel to SSPC-SP3. Remove mesh screening to apply coatings and then reinstall when complete. All Access to be supplied by contractor. (Sidewalk closers if needed). All work and Access to be coordinated with Christopher Spolidoro Director of Facilities. Paint System: Prime any rusted surface with Sherwin-Williams Chem-Bond. Intermediate coat Sherwin-Williams Macropoxy 646. Top Coat with Sherwin-Williams Acrolon 218 HS. 6.1.2 All installation work must be scheduled through Chris Spolidoro Director of Facilities, or his designee. Due to the nature of the Authority’s business some installation work may be scheduled after 5:00 pm and on weekends. 6.1.3 Because the Work is to be performed in a public area, Vendor will be responsible for ensuring the public’s safety. This will include but not be limited to proper signage and barricades necessary to deny access to area when installation is being performed.