Specifications include, but are not limited to: 8100 feet of 12 inch force main, 1880 feet of 6 and 8 inch force main, construction of one lift station with motor control center, removal and replacement of 20,000 linear feet of existing sewer main of varying sizes, removal and replacement of 67 manholes, demolition of 6 existing lift stations, abandon all three lift stations and convert wet well into manhole, install 1,160 feet of 42 inch RCP storm sewer, install 240 linear feet of 30 inch RCP, removal and replacement of all driveways and street surface affected by the work, all well pointing, bypass pumping, trench safety, SWPP, traffic control and site restoration to offer a complete, functional regional sanitary sewer rehabilitation project