All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: The CONSULTANT's personnel shall work under the INDOT Area Engineers or their designated representative. INDOT anticipates needing 2 Project Engineers (one of these 2 Engineers will be a dedicated full-time office engineer for the life of the project,) 4 Project Supervisors and 7 full-time and 2 part-time inspectors. The work type and the contractor's schedule will ultimately determine the length of time each Project Engineer/Supervisor and Project Inspector will work on this contract. INDOT may require personnel to work in any season, work for up to twelve (12) hours per day, or work at night. The CONSULTANT shall furnish all construction field testing equipment necessary to sample and test materials in accordance with INDOT procedures. The CONSULTANT shall furnish all necessary safety equipment needed for inspection and sampling and testing of materials. The CONSULTANT shall provide personnel local to the project such that neither lodging nor subsistence expenses will be incurred