Specifications include, but are not limited to: 3.1 The project consists of 6 major components: Elevator modernization, electrical system upgrade, life safety system upgrade, repair of the historic entrance canopies, front entrance granite step replacement/repair, and the flat roof replacement. The following shall be included in the Construction Management firm’s scope of work. 3.1.1 The elevator is outdated and repair parts are no longer available which results in the elevator being out of service for long periods of time. Recent violations due to the elevator’s age have been noted by State inspectors. Bay State Elevator provided the state with an elevator modernization proposal package in 2019. The proposal will be updated and used to bid out the elevator modifications. The elevator modernization includes, but is not limited to, these major components: 3.1.1.1 Remove the existing traction elevator controller and motor. 3.1.1.2 Remove existing 100A, 3P fusible disconnect.