Specifications include, but are not limited to: The Town of Wolfeboro is requesting bids for sidewalk reconstruction in 3 separate locations within the Town of Wolfeboro. Stantec used NHDOT item numbers to produce the bid schedule attached to this memo. Below is a brief summary of the work at each location. The proposed sidewalk work is located at: 1. North Main Street – Near the Wolfeboro Inn 2. Central Ave Extension – Depot Square Condominiums 3. South Main Street – At Morrissey’s Restaurant Remove the existing bituminous sidewalk and brick pavers (salvage brick pavers to the Wolfeboro Inn). The work will take place from the concrete tip down at Sewall Road and end at the entrance to the Meredith Village Savings Bank, approximately 205 LF of new sidewalk. Retain the existing vertical granite curbing. Approximately 20 LF of granite curbing will need to be removed and reset. The Town of Wolfeboro will furnish the missing pieces of curbing. Place 6” of NHDOT Crushed Gravel and 3” of NHDOT bituminous sidewalks. The new sidewalk widths shall match the existing widths. The proposed bituminous sidewalks must match the adjacent walkways in all locations. Any disturbance to the existing landscaping shall be returned to its original condition. The Contractor shall provide traffic control through the work zone at all times. The Contractor must maintain pedestrian access to the businesses at all times. Any existing striping that is disturbed due to the sidewalk/curbing installation will be re-painted by the Town of Wolfeboro.