To disassemble, transport, reassemble, and install a designated C-130 Aircraft fuselage, from its current resting spot on the Fort Bliss flight line to the designated training site on Fort Bliss at the Desert Defender Marshaling Yard (50ft of fence will need to be removed and replaced).
The contractor will provide and install a 5 Ton Heating, Ventilation, and Air Conditioning (HVAC) system and 100 amp electrical service to fully power the C-130 mechanical systems, HVAC, and lighting.
The Aircraft is a C-130, 132’7” wide, 38’3” height, 97’9” long and weighs approximately 100,000 lbs. Contractor will need to install/place three (3) concrete pads for the aircraft to sit on and provide, assemble and install permanent stands supporting the C-130 landing gear on the pads. Additionally, provide and install/place two (2) concrete pads for wing tip tie downs.
In addition, the contractor will provide any specialty materials, tools, and equipment required to meet the tasks outlined in the attached SOW.
A more in-depth explanation of the tasks outlined can be found in the attached SOW (Attch 1 - SOW C-130 Training Aid DD 22June2021).
Attachment 4 C-130 Training Aid Price Worksheet is for submitting a quote.
The North American Industrial Classification System (NAICS) Code is 488190 - Other Support Activities for Air Transportation
Primary POC: Angela Hampton (Contracting Officer)