Specifications include, but are not limited to: Lighting Upgrade Replace 86 existing fluorescent fixtures with new Lithonia‐ CLX14000LM SEF RDL MVOLT GZ10 40K 80CRI WH LED fixtures. Contractor shall supply LED fixtures and all necessary wire and supplies for installation. Provide a one‐year workmanship and labor warranty. Exterior Painting Properly prep the surface based on the requirements and recommendations set by the paint manufacturer. The previous finish was applied approximately 15 years ago and was a Sherwin Williams marine paint. Furnish and apply a water based epoxy or urethane paint/primer system designed specifically for metal buildings on three hangars that are approximately 14,364 sf, 21,320 sf and 18,096 sf of exterior walls, doors, metal sheeting/siding, soffits and trim (owner selects two colors). Contractor shall supply a system from one of the following manufacturers: PPG Industries or Sherwin‐Williams. Supply all labor and equipment which may require (not limited to: ladders, sprayers, rollers, brushes, lifts or PPE) Contractor shall be very cognizant of overspray around these aircraft operational areas. If Contractor can't control overspray they will need to brush and roll these surfaces. Paint products shall have a minimum 25 year warranty against peeling, chalking and fading. Provide a one‐year workmanship and labor warranty.