Specifications include, but are not limited to: To Provide, install and program a new differential pressure switch (DP) on the chilled water system of Capitol Complex building 9 in the existing location. Provide a new DP on the chilled water system of building 5, 11th floor using existing tap locations. Use of the existing taps will require the removal of approximately 250 feet of existing 2” piping. This will include piping, insulation, hangers, fittings, valves, etc. Remove piping to the provided dumpster. Reinsulate piping with fiberglass insulation with paper jacket exposed Use preformed insulation sections at fittings. The Vendor shall furnish all materials, labor, and equipment necessary to complete all Construction Services. The Vendor shall furnish any incidental work, materials, labor, and equipment that are necessary to complete the Construction Services, even if such incidental work is not explicitly included in the Project Plans.