Specifications include, but are not limited to: The proposed work consists of furnishing all labor, new materials, tools, equipment, and services necessary for the construction of the SOUTH FREMONT GAS MAIN EXPANSION PROJECT located in Fremont, Nebraska, including all other incidental work as shown on the Drawings and as herein specified. The City of Fremont is planning to install a new distribution pipeline from a new district regulator station located at Downing and Cloverly that transports gas to the Wholestone Farms meter set. The new pipeline will also tie back into the existing distribution station in two (2) places; one on Yager Rd and the other on Platte Ave. The project includes approximately 5,500 feet of 6-inch HDPE pipe, approximately 1,000 feet of 4-inch HDPE pipe, a new district regulator station, and two (2) tie-ins with the existing distribution system. The new pipeline will be installed primarily on public right-of-way.