Specifications include, but are not limited to: The work covered by this section of these specifications consists of furnishing all plant, labor, equipment, materials, and traffic control necessary to perform all night work operations in connection with reshaping, cleaning, and sealing of random cracks in bituminous concrete pavements, and vegetation removal and sterilization of cracks where necessary.; A. PREPARATION: 1. Debris removal: All old material and debris removed from cracks shall be cleaned from the pavement surface by means of a power sweeper or hand broom as necessary.; 2. Vegetation: When cracks show evidence of vegetation, it shall be removed, eliminating all dirt and moisture. All cracks of sufficient depth and over ¾” in width shall, when necessary, be filled with ground reclaimed rubber to within 5/8” of the top of the pavement.; 3. When necessary to allow vehicular traffic to pass over crack sealant prior to curing, dry granulated “Black Beauty” (30/60) slag shall be dusted over cracks to eliminate pick-up.; B. WORKMANSHIP: All workmanship shall be of the highest quality. All excess and spilled sealer shall be removed from the pavement by approved methods and discarded. Any workmanship determined by the ENGINEER to be below standards shall be corrected and/or replaced by the contractor.; C. TRAFFIC CONTROL: The contractor shall be responsible for supplying traffic control. Maintenance of traffic shall consist of providing and maintaining construction signs, barricades, flagmen, delineators, lights, or any other warning device as needed or ordered by the ENGINEER. A traffic control plan shall be submitted for approval before beginning the work. All costs for traffic control shall be subsidiary to the project.