Specifications include, but are not limited to: 1. The intent of the project is to complete the Elliott Hall Roof Replacement, for the Owner on a fast-track basis. It is essential that the project be completed within the shortest timeframe possible and within the period indicated. 2. The intent of the project is to require the Prime Contractor to provide all labor and material required to complete the project on the dates indicated. 3. The work generally includes the following: a. Building general construction work, for building and site clearing, as well as the repair, patching or replacing of items or surfaces cut or removed for the work including the following major items of work: Selective Demolition, Maintenance of Unit Masonry, Brick Masonry, Metal Fabrications, Miscellaneous Rough Carpentry, Sheathing, Preparation for Re-Roofing, Built-Up Asphalt Roofing, Sheet Metal Flashing and Trim, Joint Sealants, Hazardous Materials Procedures, Preparation, Removal, and Disposal of Lead Containing Painted Materials, Impacting, Removal, and Disposal of Lead Containing Materials, Working in the Presence of Asbestos Containing Materials, Site Restoration, and related work. b. Removal and disposal of existing materials removed or demolished. c. Temporary facilities as required for the project, protection of existing site and adjacent buildings, and temporary staging areas as required.