Specifications include, but are not limited to: o remove the snow (whether accumulating from snowfall or drifting), treat the roads, control ice, (whether naturally occurring or manmade) ensure water can get off of the road to any ditches or drainage structures blocked by snow or ice, and perform all other work indicated in this Contract in compliance with all the terms, conditions, and representations of the same (“the Work”) on the sections of highway listed below (“the Work Area”). Route 32 in Jefferson, beginning at the intersection of Route 126 (RLM 29.18) and extending in a northerly direction to the intersection of Route 17 in Jefferson (RLM 33.84), for a total distance of 4.66 centerline miles (9.32 Lane Miles). Route 126 in Jefferson, beginning at the intersection of Route 32 (RLM 42.75) and extending in a westerly direction to the intersection of Route 213 in Jefferson (RLM 42.26), then continuing on Route 126 (Gardiner Road) in a westerly direction to the intersection of Cooper Road in Whitefield (RLM 34.93) for a total distance of 7.82 centerline miles (15.64 Lane Miles). Total contract mileage is 12.48 centerline miles (24.96 Lane Miles).