Specifications include, but are not limited to: Renovating three existing signalized intersections at #1: WV 2 (Commerce Street) at 6th Street, #2: WV 2 (Commerce Street) at 7th Street, and #3: 7th Street, WV 2 at WV 67 (Bethany Pike). The area of disturbance will be very minimal with only a few square feet per intersection of disturbance anticipated for the installation of the signal pole foundations, pole / base mounted cabinets, junction boxes, and conduit. All disturbed areas will be stabilized with seed, mulch, stone, or concrete. All work will be within the existing right of way.; 3.00 LB CHANNEL POST, QTY LF 17.000; TRAFFIC CONTROL DEVICE, QTY UN 10,650.000; SIGNAL CONTROLLER ,01, QTY LUMP SUM; SIGNAL CONTROLLER ,03, QTY LUMP SUM; SIGNAL CONTROLLER ,05, QTY LUMP SUM; TRAFFIC DETECTOR, RADD ,02, QTY LUMP SUM; SIGNAL SECTION, G-16, QTY EA 16.000; SIGNAL SECTION, V-12, QTY EA 75.000