All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: The Project consists of the design and construction of curb ramps at approximately 109 locations along CR 10, CR 11/14, CR 15, CR 15/2, and CR 45/24 in Martinsburg to ensure ADA compliance.; Construction will include but is not limited to all necessary roadway and bridge work, drainage, utility coordination, erosion and sediment control work items, necessary foundation work, substructure work, superstructure work and traffic control. Construction engineering and management, including material quality control, will be the responsibility of the Proposer. Proposer shall fully cooperate with, and provide a QC database to the DOH. This database must provide a complete documentation of sampling, tracking, and test results for all materials incorporated into the project. It will be utilized by the DOH in the performance of their quality assurance duties. Construction will comply with DOH Standard Specifications for Roads and Bridges 2017 as amended by the 2022 Supplemental Specifications, DOH Construction Manual (October 2006*), and any special provisions.; Areas of work required for this Project will include, but are not limited to, the following items: 1. Survey Services; 2. Right of Way Acquisition; 3. Construction Plan Preparation; 4. Environmental & Permit Preparation; 5. Drainage Design including Sediment and Erosion Control; 6. Geotechnical Design; 7. Construction; 8. Project Management; 9. Construction Management; 10. Quality Control (QC) including Material Inspection and Testing; 11. Temporary and Final Traffic Control; 12. Utility Coordination and Relocation