Specifications include, but are not limited to: The work scope throughout the building will include replacement of ceilings, light fixtures; HVAC supply registers / return air grills, flooring, paint, and wall coverings. Electrical distribution and emergency power systems, building controls / automation, mechanical / plumbing systems, low voltage systems and one new elevator are also required of the Project. Within the 317,000 GSF +/-, is up to 80,000 GSF +/- of select demolition, salvage and reconfiguration of classrooms, offices, and ancillary spaces necessary for maximizing efficiencies, increasing operational reliability, and providing improved work environments. The scope is also expected to include interior / exterior upgrades for the main building entry. Exterior improvements are anticipated to include accessible routes and outdoor enhancements (decks, plazas, seating, gathering areas) with associated landscaping adjacent the building. It is anticipated that the building will be continuously occupied and require multiple staged and/or phased demolition and construction document packages and associated substantial completions The successful respondent selected for this project is expected to work with stakeholders and other university consultants on a recurring basis for the duration of the project. Specifically but not limited to the entrance renovation and exterior deck renovations. Value engineering opportunities related to long lead items, materials and scheduling.