Specifications include, but are not limited to: The project is to construct a pedestrian bridge over the existing Rush Channel which runs East-West through Mountains Edge Association. The pedestrian bridge will connect the north end and the south end of the Tenaya Paseo Trail that runs perpendicular to the Rush Channel. The scope of work includes a new prefabricated truss bridge with abutments, the realignments of the concrete trail, realignment of the existing sanitary sewer, concrete valley gutters, and maintenance road/paths along with relocation of the trail light poles. Other work includes reconstruction of the fencing to provide security and safety with gates and “No Trespassing” signs, along with restoring the disturbed landscaping rock cover and plants near the trail construction.