Specifications include, but are not limited to: a) Contractor shall provide at his/her expense all of the following: 1. Fuel 2. Fertilizer 3. Seed 4. Labor 5. Equipment 6. Farming provisions 1. None 7. In the interest of enhancing yields and improving the land the following duties apply b) Maintenance of ditches 1. Keep ditches clear of debris natural and/or manmade 2. Keep vegetation from becoming overgrown 3. Repair ditches as needed, including flattening ruts as a result of traversing ditches in a perpendicular fashion and etc. c) Current and future drainage issues 1. Present a plan of action to increase crop yields and maximize the use of property including the following items. 1. Actions to be taken to resolve drainage issues 2. Equipment to be used 3. Timeline for completion 2. Execute the above plan