Specifications include, but are not limited to: Provide all labor, materials, and equipment necessary to perform the cooling tower replacement required at the El Dorado Correctional Facility; 1. Provide and install an induced draft, counterflow cooling tower to replace the existing Tower 2.: a. Marley SPX Serial 3 102195502-A1.; b. Fan variable frequency drive with a bypass and integral disconnect.; c. Oversized bottom outlet – custom location to align with the existing piping.; d. Vibration switch.; e. Ladder.; 2. Provide and install a NEMA 1 VFD to be mounted inside the mechanical room.: a. Include a line voltage bypass; 3. Shutdown the chilled water plant, isolate and drain the cooling tower. Lock-out / tag-out the equipment.; 4. Disconnect the cooling tower and prepare piping for connection to new.; 5. Remove the cooling tower and legally dispose of it.; 6. Haul the cooling tower to the jobsite.; 7. Relocate the existing steel support rails to accommodate the new cooling towers foot print.; 8. Set the bottom section of the cooling tower on the steel beams per the IOM, aligned with the existing supply pipe.; 9. Connect the supply pipe beneath the cooling tower to the cold water basing per the IOM.; 10. Assemble the cooling tower per the IOM.