Specifications include, but are not limited to: Paint will be furnished by the HACM.; Units will be vacant.; Clean walls, as needed, Clean with TSP in heavy smoker's units, and grease cleaner/oven cleaner for greasy areas.; Remove any nails, anchors etc. from walls; Contractor must use drops.; Tape all cove bases and around windows.; Contractor(s) will need to patch, then prime patched areas in the unit before proceeding with painting. Use Prime Premix drywall Compound or Sheet Rock premix drywall compound, or approved equivalent.; Contractor must apply two coats of paint to walls and ceiling, as needed; All trim, doors and exterior jams should be painted.; Caulk inside windows, match existing color.; Contractor will face off trim of windows.