Specifications include, but are not limited to: - Removal of the (2) lakeside lodge additions (wood framing, metal roofs, and concrete foundations); - Replacement of the metal roof on lakeside of lodge to match existing lodge roof; - Repair and fill-in the open stone doorway into lodge using existing stone on site; - Removal of all concrete/stone from crawl space and concrete slab; - Repair and fill-in foundation wall hole where existing sewer line passes through; and - Grade and level lakeside lodge once removal is complete. Please note that all concrete, metal, wood, and other debris removed from the lodge must be hauled offsite as part of the selected company’s contract. Final landscaping and seeding will be completed by Fond du Lac County.