Specifications include, but are not limited to: The base bid includes providing traffic control for the length of the project; installation of 98 permanent sanitary building sewer lateral cleanouts in turf and pavement, installation of 186 lineal feet of 4-inch dia pvc sanitary building sewer lateral, installation of 378 lineal feet of 6-inch dia pvc sanitary building sewer lateral, installation of 16 4-inch to 6-inch pvc sanitary building sewer lateral reducer fittings and surface restoration.; 1. Excavate to the existing sanitary building sewer lateral at the location specified by the ENGINEER.; 2. Install a temporary or permanent cleanout.; 3. In some instances, as called out in the plans, replace the existing 6-inch to 4-inch transition fitting on the sanitary building sewer lateral.; 4. Backfill excavation as described in the CONTRACT DOCUMENTS.; 5. CONTRACTOR to provide notification to residents impacted from temporary cleanout installation. CONTRACTOR to offer each property owner an accommodation allowance, if the sanitary building sewer lateral out of service for more than 24 hours to any residential home, condominium or apartment building or other such dwelling. The CONTRACTOR shall be obligated to provide residents without sanitary sewer in the amount of $175 per day for accommodations.