Specifications include, but are not limited to: Interior - Lead Quantity: 1 Total: $ Item Notes: All finish work to be completed per the Bidding Instructions. You are responsible for repairing any damage to components remaining in place (i.e. header and casings as part of window replacement). Per Iowa Admin code 541.70.21(135) Paint Stabilization means repairing any physical defect in the substrate.; 1.1 Laundry Room, Window Exterior Sash (#s 9-11) – Abatement – Remove and replace Window Sashes with vinyl replacement. Window Casing/Header, and Sill to remain. Quantity: 1 UOM: Laundry Room; 1.2 Bedroom 1, Window Sash and Trough (#s 1/16/17) – Abatement – Remove and replace Window Components with vinyl replacement. Quantity: 1 UOM: Bedroom 1; 1.3 Bedroom 2, Window Trough (#s 12-14) – Abatement – Back-caulk and install aluminum coil stock. Caulk seams to create dust tight seal. Quantity: 1 UOM: Bedroom 2