Specifications include, but are not limited to: Contractor agrees and undertakes to demolish and remove the garage structure and debris at 18 Winter Street in its entirety, including complete removal and breaking up the foundation, slab, and any under structure found and removing as needed; and additionally as part of the project as summarized: • Coordination with the City’s asbestos contractor for safe removal of the roof and any other presumed positive asbestos; • Applying clean soil to match the natural grade of the surroundings; • Applying sufficient depth of wood chips to cover the impacted area of the property provided by the City Public Works Department from the Public Works Facility, hauled by the contractor; A. Demolition of the aforesaid structures located upon land in the City of Sanford; B. Securing all demolition permits from the State of Maine and the City of Sanford and paying for any fees required with respect to such permit; C. Removal of ALL debris from the site; D. Disposition of any and all of the demolition debris other than (I) that sold by Contractor, or otherwise recovered by Contractor as salvage, in accordance with the laws of the United States and the State of Maine and ordinances of the City of Sanford; provided, nevertheless, that Contractor is authorized to sell any salvageable components of the structures for its own account, as set forth below. Within thirty (30) days after completion of Contractor’s services,Contractor will provide the Citywith copies of anydocuments evidencing the ultimate disposition of all demolition debris, except for such as has been sold for salvage; E. The Contractor will not be responsible for tipping fees; however, all demolition materials not salvaged must be weighed by product category at an authorized disposal site and transportation manifest and bills of lading from the disposal site provided to the City for reimbursement or billed directly to the City by a pre-approved disposal site; F. The City and Contractor shall identify the disposal sites to be used prior to contract signing and may pay for disposal at the pre-identified disposal site; G. Disconnection and capping of any water or sewer service(s) at approximately 6 feet from the foundation edge, currently connected within the project to the satisfaction of the Sewer and Water Districts; H. Foundation walls, slab, underpinnings, and concrete floor shall be removed or concrete crushed to no less than 8 inch diameter sized pieces as part of the base bid; I. Any cellar holes shall be filled with clean soil as part of the base bid. The Director of Community Development must be shown the empty cellar hole, devoid of the foundation, before filling; J. Compliance at all times and at Contractor’s sole cost, during the period of demolition, with the requirements of the laws of the United States and the State of Maine, and the City of Sanford Code, including, without limitations, conformity with all reasonable demands of the FireDepartment. K. Securing the demolition area during the period of demolition at all times by reasonable means acceptable to the Building Official. In the event it shall be or become necessary to temporarily close any streets, Contractor shall, prior to commencement of the work, apply for and obtain from the Public Works Department a permit for the temporary closing of such streets. L. Pavement shall be removed.